I know I said I was on a yarn diet, but sometimes exceptions have to be made. In this case, two balls of Lily Sugar and Cream for my swiffer cover. My theory is that if I don’t buy the yarn, I can’t make the cover – and if I don’t have the cover, I can’t mop the floors. I do have one disposable pad left, but that’s obviously single-use, and the floors need mopping more frequently than I’d like to admit. And, probably, more often than I actually do it!
Besides, this should be a really quick project. It’s 69 stitches and 33 rows 34 rows, plus a bit of seaming – I can knock that out in a day, right? I also had to get new needles for this project. Who’d'a thought that I didn’t have size 7 straights? Fortunately I carry a card in my wallet with all my needles catalogued, so I was able to double-check before just buying ‘em. Now the question is – do I cast on RIGHT NOW, or do I keep working on the sock?
KnittingPirate on Facebook
KnittingPirate on Twitter
KnittingPirate's Flickr
Entries (RSS)